
Description
Buyer is responsible for the cost of water tap and connection fee as well as the cost of any septic system that the lot requires and all utilities.
-
0BEDS
-
1.54ACRES
-
0BATHS
-
01/2 BATHS
School Information
Description
Buyer is responsible for the cost of water tap and connection fee as well as the cost of any septic system that the lot requires and all utilities.
